Series 5800E-wall silicone gasket curtain wall system Installation instructions Part NO. Y330 February 2013
9/2000PAGE 8removed and the ends extend freely into the vertical mullion cavity.STEP #1 INSTALL CONDENSATION WICKinsert about 1 1/2" of each end
STEP #1 INSTALL GLAZING ADAPTORScut shorter than the opening dimension. Locate and insert the adaptor in the thickness of less than 1". Horizonta
straight into the gasket pocket. STEP #2 INSTALL VERTICAL GASKETAllow the horizontal gasket to run through. Butt the vertical gasket to thethe gasket
PROJECT SHOP DRAWINGS.BLOCK EVEN WITH THEFRONT OF THE MULLIONPOSITION THE SETTINGTONGUE.9/2000bite should be 9/16" in a 2 1/2" wide system.
9/2000PAGE 12included in the cost of the materials for the job.NOTE: Temporary retainers are available from EFCO by request only and are notREQUIREMEN
illustrations below for proper installation of the exterior gasket).gaskets are not overdriven into the gasket receiving pocket (see the "A"
SECTION VIII: EXTERIOR GASKET INSTALLATION CONT.corners at the intersections of the vertical and horizontal members.The gasket surface should be smoot
CORRECTNOTE: Feel the gasket surfaceto ensure it is smooth and flat.CORNERS LINE UP.ALL GASKETBEFORE ADJUSTMENTAFTER ADJUSTMENTINCORRECTALIGN PROPERLY
not to separate the gasket joints. Do not stretch the gaskets to make them fit.At very large openings, a butt joint may be required to facilitate hand
perimeter sealant continuously to the prepared substrate and previously cleanedInsert the specified backer material into the perimeter joint and apply
7/2011 Minimizing CondensationNote: Please reference EFCO's "Understanding Condensation" brochure which can be o
DEGLAZING TOOL PART #HM47Stalgard is a registered trademark of Textron, Inc.MOLDED CORNER DARTdeglazing tool provided directly between the gasket inte
9/2000PAGE 1C. The sequence of erection should be coordinated with the project superintendent to prevent delays and minimize the risk of materialdama
is required, it must be applied to clean surfaces. All perimeter substrate document compatibility or other findings in written test reports. All fra
work into place along thefillers, start at one end andNote: When attaching pocketCONTINUOUS POCKETPrestage necessary tools and materials in the work a
9/2000PAGE 4be filled in as additional mullions are erected.DEAD LOAD ANCHORBOLTED TO STRUCTUREAFTER ANCHORING).TEMPORARY ALIGNMENTNOTE: On long runs,
SECTION II: VERTICAL FRAME INSTALLATION CONT.Splice joints should occur at spandrel areas (if possible).Refer to approved shop drawings for actual loc
perimeter seal later.THE BACKER CUT AND FOLDROD 90 DEG.STEP #1 PLUG ENDS OF PERIMETER HORIZONTALSspacing to avoid dimensional build-up across the open
9/2000STEP #3 INTERMEDIATE HORIZONTALSlocations at every fifth mullion spacing to avoid dimensional build-up acrossbefore and after fastening the hori